Request for Proposals for Fuel Cell at York Correctional Institution
Request for Proposals for Fuel Cell at York Correctional Institution
Due Date: 5 pm ET on Tuesday, August 16, 2022
Request for Proposals for Fuel Cell at York Correctional Institution
- Appendix A – Suggested Location and Configuration
- Appendix B – Standard Contract for the Purchase and Sale of Connecticut Class 1 Renewable Energy Credits
- Appendix C – Hourly Electric Data
- Appendix D – Hourly Hot Water Data
- ‘Appendix E – Electrical One-Line
- Appendix F – Hot Water Return Connection Points
- Appendix G – Department of Corrections Clearance Form
- Appendix H – State of Connecticut Solar PPA Template
- YCI Fuel Cell RFP Q&A
RFP Q&A Document Index
- Eversource meter information – attached bill Meter #081031681, Acct#5189 620 3049 (Attachment wes1_9.10.2021_10.30.07)
- Photos of items requested during walk through
- As-Built drawings – YORK 19-065 ASB (11-13-20) Underground Piping cover page AB001, AB200, AB202, AB306 and AB400
- Submittal – Building 10 Doghouse
- Submittal – Doghouse Roof SD
- Submittal Doghouse Heat Trace
- Contract Drawings BI-JA-465 Vol 2 of 2 – Cover Page, page A250 Doghouse & page A510 Doghouse Roof
- Submittal – Water Flow Meters
- Contacts for Russ Electric-Siemens and SNEET
- 4160V to 2300V Transformer Nameplate
- 4160V Generator Switchgear Report
- 480v one lines for Building 10
- Drawing E6.2 (including site layout (E0-2R)
- Russelectric Generator Control Switchgear (Sects 1_2_3)
- 12 Months Utility Invoices
- Natural Gas Line Location Map